COMPLETE BATHROOM RENOVATION
JUST
€ 4,000.00
1. Removal existing health, including unloading and transport material is the PP. DD.
2. floor and wall demolition, including waste material and transport it to the PP. DD.
3. Training plumbing pipe full of hot and cold water, waste and labor.
4. Remake : Screed - Shaving and laying tiles.
5. Material supply and installation:
- 20 sqm tiles 20x20 color
- 40 pcs band decorated
- Taps Mistral : basin-bidet-g.vasca
- Health Arianna : basin - column - vaso-bidet
- Bath 160-170 / x 70
- Deposit built Tropea
- accessory kit assembly
full bathroom with shower supply and installation:
- shower 80x80
- Latch rain
- Iberian Shower crystal
0 comments:
Post a Comment